Annex VII checklist
| Entry | What to include | Example evidence |
|---|---|---|
| 1 · Product description | Intended purpose, compliance-relevant software versions, relevant hardware visuals, and Annex II instructions and information. | T100 product sheet, firmware 1.4.0, label photos and user guide. |
| 2 · Design, production and vulnerability handling | Architecture and development and production processes, including monitoring and validation. Describe vulnerability handling, including the SBOM, CVD policy, evidence of the contact address and secure update distribution. | Device–app–service diagram, release procedure and records of contact and update tests. |
| 3 · Risk assessment | Article 13 assessment and applicable Annex I Part I requirements. | Release risk register and applicability rationale. |
| 4 · Support period | Information relied on to determine the support period under Article 13(8). | Decision record considering expected use and support for key components. |
| 5 · Technical basis | List applied OJEU-cited harmonised standards, common specifications or European cybersecurity certification schemes under Article 27, including parts applied. Otherwise describe the adopted solutions and list other relevant technical specifications used. | Reference register and solutions for requirements those references do not cover. |
| 6 · Test reports | Tests verifying the product and vulnerability-handling processes against the relevant requirements. | Reports that identify the release, test conditions and results. |
| 7 · Declaration | Copy of the EU declaration of conformity. | Product-specific declaration following the applicable conformity assessment. |
| 8 · Supplying the SBOM | Where applicable, provide the SBOM after a reasoned request from a market surveillance authority where necessary to check Annex I requirements. | Release-specific SBOM and a record of any provision. |
Before market placement and during support
Article 31 requires preparation before placing the product on the market and continuous updates where appropriate, at least during the support period. Entry 8 governs the request for an SBOM; it does not remove the Annex I Part II point 1 obligation to draw one up.
Start with a release index: hardware, firmware, app and the relevant remote service version. Link each report to its configuration. If the test was done on an earlier release, justify reuse or schedule a new verification.
Primary source: Cyber Resilience Act
Continue with the T100 example
- CRA cybersecurity risk assessment: a worked IoT example
- CRA Annex I evidence matrix: requirements to product release