Restrict access to build, signing and publication systems, and retain evidence of who authorised each release. Before installation, verify the authenticity of update metadata and the integrity of the associated package. A checksum alone does not establish trust if the expected checksum has not itself been authenticated.
Assess replay and downgrade risks separately. Version and freshness checks can help reject stale or unauthorised updates; any permitted rollback needs a controlled, risk-based process. Test failed installations and recovery to a known-good state, including the compatibility of persistent data and configuration. Make success and failure visible to the user or administrator where appropriate.
Potential evidence includes signed manifests, verification results, key protection and rotation procedures, downgrade tests, recovery-test reports and deployment records tied to the specific release. A document's existence does not itself prove that a control is effective or applicable.
The ENISA advisory is technical guidance, not a harmonised standard, legal advice or a presumption of conformity. CRA Annex I includes requirements concerning secure update distribution and timely vulnerability remediation. The advisory does not establish whether a patch is technically correct or fully resolves a vulnerability. Assess the applicable obligations and evidence against the actual product and its support context.
CRA security updates: patch policy, OTA rollout and evidence
Publishing an update, delivering it to users and confirming installation are three different events.
What the CRA requires
Annex I Part II calls for vulnerabilities to be addressed without delay, secure update distribution, and prompt dissemination of available security updates with user advice. Updates are generally free of charge unless the manufacturer and a business user agree otherwise for a tailor-made product. Part I point 2(c) addresses automatic updates where applicable, including default enablement, an easy opt-out, notification and temporary postponement. The CRA does not prescribe a specific OTA technology.
Patch policy and OTA rollout
For each release, record supported versions, the triage owner, priority criteria, the emergency channel and the release approver. Verify package authenticity and model compatibility. Plan staged deployment with stop thresholds and a secure recovery path; phasing must not justify undue delay.
- Test recovery after power loss and reconnection.
- Give offline users a supported manual route and instructions.
- Assess Article 14 separately: publishing a patch is not filing a report.
What to retain as evidence
For the T100 sensor, link 1.4.0 → 1.4.1 to the fix ID, package digest, test result, approval and publication date. Track rollout cohort, installation outcome and the version verified after restart. Missing telemetry means unknown, not success. Assign an owner and next step for unconfirmed installations.
Secure Update Mechanism Assessment
Review six areas for one product and release. Answers stay on this page; they are not sent or saved to Workspace.
Answers other than ‘yes’: 6 / 6
This is not a conformity assessment or proof of effectiveness. Review every answer, including ‘yes’, against the product, risk and evidence.
ENISA Technical Advisory v1.0 ↗